The project highway is the prosecution of
the existing Anthoupolis – Kokkinotrimithia highway, to
reach the towns of Astromeritis and Troodos.
The total length of the
highway, including the link to Troodos, is
25.7 km with about 4.5 km of 2-lane link roads.
The
contract, in fact,also includes the design of the three
link roads:
-
Akaki link : a 2 lane road from Deneia –
Kokkinotrimithia interchange to the existing road, (2.5
Km)
-
Peristerona link: a 2 lane road from exit
from Avlona - Astromeritis interchange (1.7 Km)
-
Troodos link: a 4 lane road from exit
from Katokopia
Astromeritis interchange (6.4 Km)
The project highway
runs over a generally flat to slightly rolling terrain,
mainly constituted of calcareous sedimentary rock and
recent alluvial soils, quite densely inhabited and with
scarce vegetation, with the exception of the last part of
the main alignment and the majority of the link to Troodos
which cross an orange orchard.
In total
the following main structures envisaged:
·
9 interchanges
·
several bridges
·
5-7 underpasses/overpasses.
The typical cross section includes two 3.5
m. lanes per carriageway, 2.5 m. paved shoulders and
narrow median delimited by guard rails or New Jersey type
concrete barriers. |