DAMS & CANALS
Hydroelectric power point of Pont Ventoux - Val Susa, Italy
Client: Temporary
Association of contractors (Spie Battignolles, Grandi Lavori
Fincosit, Vianini, Condotte) for
"Azienda Elettrica Municipale
(AEM) di Torino".
Services:
Feasibility study, preliminary and final design of the
hydraulic works, surveys and investigations, tender
documents
Period: 1992 - 1993
Construction cost:
€ 61,974,800
The project:
The AEM of Torino has tendered the construction of the new
Hydroelectric Plant of Pont Ventoux, in Val Susa, which
foresees the partial utilisation of Dora Riparia river
waters.
The project includes:
-
the main diversion structure constituted by a dam on Dora
Riparia River, a water intake structure and all ancillary
works;
-
a free surface offtake canal constructed in tunnel for a
length of 14 km and a peak flow of 30 m3/sec.;
-
a regulating reservoir in Val Clarea of 560,000 m3 capacity,
constituted by a 33 m. high dam and bypass canal;
-
pressure tunnel of 2.75 km in length connected to a pressure
steel pipeline of 685 m. in length and 2.8 m. dia.;
-
electric power plant of 388 GW;
-
ancillary works such as access roads and tunnels, restitution
canal etc.
The project was carried out in association with Electricité de
France and Coyne et Bellier of France.
Back to Dams & Canals