Milan-Naples High Speed Railway Line: Milan -  Bologna  Section.  Civil Works for a Section of about 18 Km between KP 45 and KP 63 - Italy

Client: Grandi Lavori Fincosit - Roma

Services: Final Design

Period: 1997 - 1998

Construction cost: € 173,529,518

The Project:

In the context of the concession for the realization of the Milan-Bologna section of the Milan-Naples High Speed Line,  entrusted to the CEPAVUNO Consortium (of which Grandi Lavori Fincosit S.p.A. is a member) by the public company T.A.V. (Treno Alta Velocità - High Speed Train), TECHNITAL has been charged with the final design of certain civil works.

The project referred to some structures on the section of the new high speed line of GLF competence as well as on the Piacenza East branch line. The works designed included:

  • 1 railway viaduct with a pre-stressed deck, over 5 km long;

  • 1 8-span railway viaduct with a multiple-beam deck  in a mixed steel and concrete structure and piers in the river bed  and stream

  • 2 single span railway viaducts with a deck  in a mixed steel and concrete structure

  • artificial tunnel passing under the A1 Motorway and adjacent box culverts;

  • 4 rectangular underpasses of various cross-sections and lengths, to guarantee the continuity of the roads interfering with the railway alignment. The largest and longest underpass includes a pre-cast section to be pushed  into place under the A1 Motorway.

The services included, besides the final design of all the permanent structures, the temporary works necessary for the realization of the permanent ones. This part of the activity was also extended to the 9 railway overbridges foreseen in the section of line for which GLF is responsible.