Client:                          Venezia Nuova Consortium for the Ministry of Public Works - Water Board (Venice)

Services:                    Surveys and investigations; Basic, Preliminary and Detailed design                                   

Period:                        1988 - 2002

 Construction cost:  € 2,685,600

 The project:

TECHNITAL carried out the Preliminary and Detailed design of the sewerage network for the town of Sottomarina in the context of the project to protect Sottomarina from the high tides.

The new sewerage network, consisting of a free surface flow system for mixed sewage, was designed to connect the local sewerage system (prior to the start of the works connected directly to the lagoon by means of sewers having little or no gradient) to the treatment plant operated by the Municipality of Chioggia, thereby achieving the double objective of reducing the discharging of organic waste into the lagoon and preventing the tidal flow from rising up through the rainwater gulleys.

The sewage is disposed of by pumps located in 3 pumping stations, either directly into the lagoon (when there is sufficient rainfall to guarantee adequate dilution), or conveyed to the treatment plant (when there are high concentrations of organic wastes).

The project affects the entire historic centre, the system having a total length of 950 m. Ten pumps with a flow-rate of 0.3 m3/s were installed, for a total applied capacity of approximately 300 KW.

 The works have been completed.

 

  Back to Water Supply & Sewerage                     Next Project >>
 

 

Home | About TECHNITAL | Projects | Special Projects | Contact Us

Copyright ©2004 Technital S.p.A.  -  All Rights Reserved. Site developed by Technital IT Division.