ROADS & MOTORWAYS
Improvement
of Accesses to the Port of Genoa - Italy
Client: A.N.A.S.
(State Highway Authority) Department of Genoa
Services: Preliminary
design, environmental impact assessment study and detailed
design
Period: 1996
– 1999
Construction Cost: €
56,810,259
The Project:
The first contract awarded to TECHNlTAL concerned the
Preliminary design and environmental impact assessment of the
works necessary to improve accessibility to the port of Genoa.
The preliminary design and related environmental
impact assessment of the works necessary to improve
accessibility to the port and create better functional areas
was completed in 1999. It foresaw three urban interchanges in
the Sampiedarena area of Genova, between the Polcevera river
in the west and S. Benigno district in the east
*
link from Pieragostini bridge to the port area and the
seafront (Lungomare Canepa),
*
reorganization of the seafront road and parking area for
lorries,
*
link to the customs area of the port.
Subsequently Technital was commissioned to carry out the
detailed design for the Polcevera accesses, including
connection to the motorway network, improvement of the
interchange, reorganization of the seafront and service areas
of the port and redesign of the entire road and rail system in
accordance with the urban and port planning requirements.
|