TRANSPORT: Roads and Motorways | Bridges & Viaducts | Tunnels | Railways | Airports

 

 


TUNNELS
Valtrompia Motorway, Lombardy - Italy

Client:                                Autostrada Brescia – Verona – Vicenza - Padova S.p.A.

Services:                            Detailed design, environmental impact study and safety plan

Period:                               2000 – 2002

Construction cost:                292,969,988

The Project

Detailed design, environmental impact study and safety plan for the motorway link (42 km) between the A4 (Milan -Venice) motorway and Valtrompia, including tunnels, viaducts, interchanges, special structures, and lighting, ventilation, safety and toll installations.

Owing to the traffic forecast (some 26,000 vehicles/day through the Concesio tollgate) the sections between Ospitaletto or Brescia West and the branching of the motorway to Sarezzo and Lumezzane will  have a four-lane divided carriageway and a design speed of 80-100 km/h.

The sections north of this branch, on the other hand, in view of the traffic forecasts and the morphological constraints, will have a single two-lane carriageway and the same design speed of 80-100 km/h. An additional slow lane will be added for heavy vehicles for the ascending section between the Sarezzo turnoff and the locality of S. Apollonio.

Technital is responsible for the project management on behalf of the temporary association Technital - Spea Ingegneria S.p.A. - S.I.N.A. Società Iniziative Nazionali Autostradali S.p.A. – Tecnic S.p.A. and Rocksoil S.p.A.  As the leading company of the group Technital’s share amounts to 45% of the total contract value.


 
Back to Tunnels

 

 

Home | About TECHNITAL | Projects | Special Projects | Contact Us

Copyright ©2004 Technital S.p.A.  -  All Rights Reserved. Site developed by Technital IT Division.