BRIDGES & VIADUCTS
Viaducts on the Gumusova - Gerede Section of the Antaolian Motorway - Turkey

Client:  
Astaldi-Bayndir AS J.V.

Services:
  Detailed Design of 2 viaducts; Seismic isolation system design & dynamic analyses for 3 viaducts; Hydraulic design & Riverbed training. Design supervision Assistance during construction.

Period:
12/2000 – 12/2003

Construction cost: 
80,000,000 

The Project:

TECHNITAL was awarded a contract by the contractors Astaldi-Bayndir AS J.V. responsible for the construction of the Gumusova-Gerede section (Stretch 2D) of the Anatolian motorway (Istanbul-Ankara) regarding the structural design of 3 viaducts across River Arsarsuvu and related seismic isolation system.

 In particular the activities entrusted to TECHNITAL include :

  • Final and detailed design of 2 viaducts in a seismic area: Viaduct 2 (length 1200 m), Viaduct 3 (400m), including the design of seismic isolation system and dynamic analyses of a further viaduct, Viaduct 4 (700m), in accordance with the American AASHTO standards .

  • Hydraulic design & riverbed training: In this case the tasks include the preliminary and final design of hydraulic works along the motorway alignment (approx. 4 km) and the training of Arsarsuyu river and its tributaries.

Assistance to the Client during construction and supervision of the whole design..
 